The Parcel
2.3 acres. Bordered on three sides by protected recreation & wetland space. Adjacent to US Hwy 160 with high viability, and foot traffic potential.
Approved for cannabis uses (Commercial, Construction type V-B) Developed to meet both City and County Code.
New city water and sewer services.
On-site irrigation well
New 3-Phase power service and transformer 1600amps @280V (60% lower electric rates vs. Xcel in Denver).
8,000sq ft Manufacturing Facility, 1,680 s.f. residential property on site, plus a 225sq ft workshop, and x10 secure storage sheds = 1000 sq ft.
Total Built footprint = 11,905sq ft.
Strategic SW Colorado location
Low sales and property taxes
Opportunity for significant expansion or additional uses
The Facility
8000 s.f. completed in 2017
Purpose built for manufacturing from the ground up.
Steel Frame with R30 insulation (Meets City and County Building Standards)
Sealed Concrete Floors, With Metal Clad Interior Walls & Ceilings.
State of the art building management systems include:
Closed loop chilled water plant designed by SURNA with Trane chillers.
Supplemental Dehumidification, Condensate Recapture, & Water Recycling
Overengineered Power Distribution and Management
Ultra clean, well maintained and efficient design allows for very low-cost production, and sustainability.